Skip to main content

Department of Energy

ARPAE


Advanced Research Projects Agency–Energy Project:

A Solvent/Membrane Hybrid Post-combustion CO2 Capture Process for Existing Coal-Fired Power Plants
July 2010 - June 2013
$1,517,470

 

NETL


National Energy Technology Laboratory Projects:

Application of a Heat-Integrated Post-combustion Carbon Dioxide Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant
October 2011 - March 2020
$16,291,967

Solid-Fueled Pressurized Chemical Looping with Flue-Gas Turbine Combined Cycle for Improved Plant Efficiency and CO2 Capture
October 2012 - September 2013
$599,687

Application of Chemical Looping with Spouting Fluidized Bed for Hydrogen-rich Syngas Production from Catalytic Coal Gasification
October 2014 - May 2019
$491,471

Coal-fueled Pressurized Chemical Looping Combustion with a Spouting Fluidized Bed
September 2015 - May 2019
$699,556

Large Pilot CAER Heat Integrated Post-combustion CO2 Capture Technology for Reducing the Cost of Electricity
October 2015 - October 2017
$999,070

Staged OMB for Modular Gasifier/ Burner
December 2017 - May 2021
$1,612,308

Gasification Combined Heat and Power from Coal Fines
December 2017 - September 2019
$1,599,753

Intensified Flue Gas Desulfurization Water Treatment for Reuse and Zero Liquid Discharge 
January 2018 - January 2020
$738,921

UKy-CAER Heat-integrated Transformative CO2 Capture Process for Pulverized Coal Power Plants
April 2018 - May 2021
$3,375,336

A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In‐Column Heat Transfer 
May 2018 - Jan 2022
$2,986,182

Advancing Post‐Combustion CO2 Capture through Increased Mass Transfer and Lower Degradation
October 2018 - September 2022
$2,900,000

An Intensified Electro-Catalytic Process for Production of Formic Acid from Power Plant CO2 emissions 
January 2019 - December 2021
$799,987

Fog and Froth-based Post Combustion CO2 Capture in Fossil Fuel Power Plants 
May 2019 - December 2023
$2,947,404

Ash Fouling Free Regenerative Air Preheater for Deep Cyclic Operation 
August 2019 - August 2024
$1,999,864

Intensified Catalytic Conversion of CO2 Into High Value Chemicals
October 2020 - March 2023
$999,984

NH4OH Looping with Membrane Absorber and Distributed Stripper for Enhanced Algae Growth 
October 2020 - September 2024
$2,999,564

Enhanced Depolarized Electro-Membrane System for Direct Capture of Carbon Dioxide
October 2020 - March 2022
$699,509

Electrochemically Regenerated Solvent for Direct Air Capture with Cogeneration of Hydrogen at Bench-scale
October 2021 - September 2023
$1,313,887

Dual-Loop Solvent-based CCS for Net Negative CO2 Emissions with Lower Costs
March 2022 - February 2025
$2,452,268

Application of Transformational UKy 3 Ton/day CO2 Capture System at A Steel Process Plant 
April 2022 - January 2026
$4,999,965

Enhancement of Carbon Capture Reactor Performance
February 2023 - August 2024
$997,698

Negative-Emissions Enabled Direct Air Capture with Coupled Electro-Production of Hydrogen at a 5 kg-per-hour Scale
August 2023 - July 2026 
$2,999,681

NREL Logo


Department of Energy National Renewal Energy Laboratory Projects:

Novel, Biological, Sustainable and Low Energy CO2 Separation
2019-2021
$375,000

Robust Carbonic Anhydrases for Novel Biological, Sustainable and Low Energy CO2 Scrubbing Process from Waste Gases
2022-2023
$30,000